On a whim, I did a search for some PoE switches on eBay. I wanted to see what use Catalysts are going for these days.
I was shocked. You can pick up a 24 port 3500 for under $300. For under $2,000, you could potentially get a switch, a server and a handful of phones and set up a rock solid Asterisk system for an office. That's crazy, considering the first Cisco VoIP system I put together in around 2002 was well over $80,000 for about 30 phones. Most of it was licensing.
Showing posts with label cisco. Show all posts
Showing posts with label cisco. Show all posts
Monday, October 1, 2007
Cisco 35xx on eBay
Posted by
Gary
at
9:57 AM
0
comments
Sunday, July 1, 2007
Switch Upgrade
Yesterday was the big switch upgrade. We replaced our old Extreme Alpine 3808 with a stack of Cisco 3750's. Here are the obligatory before and after shots:
We have three 3750's for the workstations and two 3750G's for our servers (yup, finally gig to all the servers). It's all PoE as well. The 3750's all use the StackWise cables to interconnect at something like 32GBits/second. We've also started using CNA to configure and manage the switch, though I'm still a lot more comfortable with the command line.
Here are some things I've learned about doing this sort of thing:
- If you can afford it, pre-wire all of your ports.
When trouble shooting and configuring, we can always assume that if your computer is plugged into the wall jack 2-14, it is also going to be plugged into switchport fastEthernet 2/0/14. That means no more searching for mac addresses to locate ports.
- Put your switches as close to your patch panels as you can
This meant we had to use 7' cables in a lot of cases. We also over filled our cable management as all the cables cross each other.
Each switch is now directly across from the patch panel that plugs into it. We used essentially nothing but 4' patch cables and most of those had one or two feet of slack.
- There is no such thing as too much cable management
We added some, but I wish we had more.
- Cable in bunches
Before I attempted silly things, like merging bundles, but that just makes it harder to trace bad cables.
We've tested a lot, but I'm sure Monday and Tuesday with both be long days anyway...
Posted by
Gary
at
9:43 AM
0
comments
Labels: cabling, cisco, extreme, server room cleanup, switches
Subscribe to:
Posts (Atom)